SCEA Robin (01) is an operation with 400 sows N/E recovering approximately 10,500 m3 of slurry/year.
50 kW unit / 600 m3 digester
Engineering office: BIO4GAS
Start-up: April 2013
MIRO components:
TEMPORARY MANURE STORAGE |
GTWSB 1040 (7.5 kW) mixer on stainless steel post |
DIGESTER |
GTWSB 1040 (7.5 kW) mixer on stainless steel post |